Current location of water allocations in the Bowen River Water Management Area

A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules then the change will generally be approved.

Annual Volumetric Limits as at COB 01 November 2024

Unsupplemented

A change to the location of a water allocation is possible between zones.

If the change can be made within the constraints set by the trading rules, then the change will generally be approved.

Bowen River Water Management Area- All Water Allocations in Group C1
Zone Maximum Annual Volumetric Limit* Projected Annual Volumetric Limit* Trade into zone permitted?
Bowen Broken Zone A 2,071 0.00 No
Bowen Broken Zone B 2,071 0.00 No

* Volume in Megalitres

Projected volume represents the forecasted “current volume” assuming all outstanding dealing certificates or applications under assessment will be registered on the water allocations register. This is also referred to as the “annual volumetric limit”.