Current location of water allocations in the Fitzroy Barrage Water Supply Scheme

A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules then the change will generally be approved.

HIGH priority water allocations (ML)
FITZROY BARRAGE WATER SUPPLY SCHEME Nominal Volumes as at COB 20th Dec 2024
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Zone Fitzroy A 48,800 50,483 51,200 50,483

All values in Megalitres

* This represents the forecasted “current volume” assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

MEDIUM priority water allocations (ML)
FITZROY BARRAGE WATER SUPPLY SCHEME Nominal Volumes as at COB 20th Dec 2024
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Zone Fitzroy A N/A 11,610 N/A 11,610

All values in Megalitres

* This represents the forecasted “current volume” assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.